Day 9:
Bag 9 today! I was rather surprised that today’s build actually completed this second building (I thought bag 10 would complete it!), but what a great way to finish it off! The roof area is completed and includes a small second floor attic, with room for some newspapers, a mouse and some cheese. Also added to the build are three shop signs that really add a level of realism. Viewing the bulding from the side angle, it really sells the Diagon Alley aesthetic.
I couldn’t help but try connecting the two completed buildings together; both single line and opposite each other. They look incredible! I can only imagine how awesome it will look with all four builds.
Check out today’s speed-build video, below!
Seb